Track works

2024, the start of the RRI Rapid Suite – Industrialized Rail Renewal

In 2024, ETF introduced a new Rapid Suite: Industrialised Rail Renewal (RRI). With the help of 20 gantry cranes, a custom-designed welded long-rail train and the REVO train, our teams will be renewing almost 300 kilometres of rail a year for SNCF Réseau.

This Rapid Suite stands out for its ability to lay welded long rails measuring 432 metres, a first in France achieved without prior unloading.

As part of the RRI contract with SNCF Réseau, ETF will be renewing 675 kilometres of track over five years. This constantly evolving mission demonstrates our ability to meet the growing need for industrial track regeneration, ensuring safe, fast and sustainable rail mobility.

Read online

QR Code
No personal data is collected when using this service.